Dig Diary – Wednesday, August 23, 2017
Day Thirty-Eight
The cover-up begins…

Above and below: Sandbag chain in Structure Twelve.

Hundreds upon hundreds of tyres were relocated to the trench sides, ready for the cover-up operation.
Wednesday, August 23, 2017
Above and below: Sandbag chain in Structure Twelve.
Hundreds upon hundreds of tyres were relocated to the trench sides, ready for the cover-up operation.