South-western drain running from the end of the building. The drain is filled with sandbags to protect it structurally. (📷 Sigurd Towrie) Saturday, July 15, 2023 (5:46 PM)
Dig Diary – A flint knife, pillowstone fragment and successful operation to recover timber Monday, August 14, 2023